DLS SandView
DLS

SandView

DLSAPEX Sand Solution · live intake, inventory & ticketing
Pad Bighorn 12-3 · Converse Co., WY Job Zipper frac · 4 wells · 100 mesh / 40-70 Storage 6 rented silos · DLSAPEX lanes A/B
Live · 19:42:10Demo data
On-pad inventory
1,046t
5.1 h cover
Rate to blender
11,850lb/min
Demand 11,900 · −0.4 %
Trucks en route
14loads
Next in 7 min · 336 t inbound
Delivered today
4,392t
183 loads · 100 % ticketed
Truck time on pad
6.4min
No detention today
Dust · PM10 worst sensor
31µg/m³
Under action level

Inventory — last 12 h and next 12 h

Forecast from stage schedule, live draw and trucks en route
Inventory (measured) Forecast Pumping stages Truck arrival 4-hour cover

Storage by unit

Load cells × radar, reconciled
40/70 612 t100 mesh 434 tFree space 254 t

What needs attention

Last 6 hours

Lanes now

DLS drive-over intake

Next arrivals

Trucks en route and on pad

ETAs from ELD telematics + road conditions
UnitCarrierTrailerMeshTonsStatusETA / lane

Lanes

Lane lights cue the driver's gates so the hopper never overfills. Average cycle today 6.4 min; best 4.1 min.

Dispatch plan

Next 6 h
Loads scheduled per hour vs. forecast consumption. Spot capacity (2 loads) requested at 19:55 for the 02:00–04:00 window.

E-tickets — today

Mine BOL matched to measured tons (silo weight change × belt scale). Dry-basis tons shown for damp loads.
TicketTimeUnit · carrierMine BOLMeshBOL tMeasured tMoistureDry tΔStatus
Loads 183BOL 4,405 tMeasured 4,392 tVariance −0.3 %Flagged 2

Stages pumped today

Designed vs. delivered sand per stage

Day summary

Stagestoday
9 pumped · 1 in progress
Sanddesigned
4,110 t
Sanddelivered
4,098 t · 99.7 %
Starveevents
0
Wait on sandminutes
0
Stage report and reconciliation are emailed to the completions engineer and the frac supervisor at the end of each stage.

Respirable dust — PM10 at pad perimeter

Continuous monitors; OSHA silica action level 25 µg/m³ (8-h TWA respirable silica) — PM10 shown as the field proxy

Compliance log

Auto-generated
8-h TWA estimate, both lane positions: below action level. Sampling pumps on operator and driver positions running (day 6 of 30).
Wind shift to WSW 18 mph — lane cueing slowed 10 % for 40 min; collector fan to 100 %.
Daily housekeeping completed; HEPA vacuum only, no compressed air.

Power & emissions

Dieseltoday
212 gal
CO₂eper ton delivered
0.49 kg
Gensetrun hours
21.5 h
Demo data. Numbers are simulated to show what the customer view looks like on a live job. Direct Logistics & Services · jakob@directlogisticsandservices.com