Stage report and reconciliation are emailed to the completions engineer and the frac supervisor at the end of each stage.
Respirable dust — PM10 at pad perimeter
Continuous monitors; OSHA silica action level 25 µg/m³ (8-h TWA respirable silica) — PM10 shown as the field proxy
Compliance log
Auto-generated
8-h TWA estimate, both lane positions: below action level. Sampling pumps on operator and driver positions running (day 6 of 30).
Wind shift to WSW 18 mph — lane cueing slowed 10 % for 40 min; collector fan to 100 %.
Daily housekeeping completed; HEPA vacuum only, no compressed air.
Power & emissions
Dieseltoday
212 gal
CO₂eper ton delivered
0.49 kg
Gensetrun hours
21.5 h
Demo data. Numbers are simulated to show what the customer view looks like on a live job. Direct Logistics & Services · jakob@directlogisticsandservices.com